PAEC

High-Performance Heavy Equipment for Your Porjects

Our Equipment & Resources

Pak Asia Engineering’s diverse inventory of heavy equipment and machinery enables reliable and efficient delivery of engineering & construction projects.

1 +
Years of Experience
1 +
High-Performance Machines
1 +
Trained & Certified Operators
1 +
Years of Experience
1 +
High-Performance Machines
1 +
Trained & Certified Operators

Hamza Power Plant

Chanar Energy Limited

Chiniot Power Plant

JDW-III Ghotki Sugar Mills

JDW-III Ghotki Sugar Mills

Ongoing & Completed Projects

Sr. No.Client NameProject DescriptionStatusContract ValueLocation
1Etihad Power GenerationFabrication, Erection, Installation and Commissioning of 37.2 MW Co-Generation Power Project.On Going 320,000,000 Rahim Yar Khan
2Etihad Power GenerationDesign, Supply, Fabrication, and Erection of Condensate & Overhead Surge Tank.On Going 27,000,000 Rahim Yar Khan
3Sheikhoo Sugar MillsSupply and Installation of 40 TPH 67 BARG Boiler.On Going 92,000,000 Kot Addu (Sanawn)
4JDW Sugar Mills LtdFabrication and Erection of Fire Fighting Complete Network.On Going 27,189,281 Kot Sabzal (Sadiqabad)
5GH2 Industries Pvt LimitedFabrication and Erection of Piping SS & CS.On Going 40,000,000 Gharo Hyderabad
6GH2 Industries Pvt LimitedEquipment installation, Leveling, Loading, and Un-loading Shipment.On Going50/KGGharo Hyderabad
7GH2 Industries Pvt LimitedFabrication and Erection of UPVC Piping.On Going800/KGGharo Hyderabad
8GH2 Industries Pvt LimitedFabrication and Erection of Piping SS Hopper and conveyer.On Going230/KGGharo Hyderabad
9Hamza Power PlantErection Of boiler (190 TPH).Completed 92,063,400 Khan Pur
10Chanar Energy LimitedFabrication & Erection of Piping, Chimney, Tanks, and Erection of Vessels.Completed 57,500,000 Tandlianwala
11Chanar Energy LimitedBagasse Fuel System, TG, Cooling Tower, EOT Crane.Completed 31,010,000 Tandlianwala
12Chanar Energy LimitedErection of Boiler (115 TPH).Completed 96,000,000 Tandlianwala
13Hamza Power PlantErection of Boiler (150 TPH).Completed 100,000,000 Khan Pur
14Chiniot Power LimitedErection of Boiler (155X2).Completed 230,330,000 Chiniot
15Chiniot Power LimitedFabrication & Erection of Piping.Completed 200,000,000 Chiniot
16Ghotki Sugar Mills (Pvt.) LtdFabrication and Erection.Completed 32,867,650 Ghotki
17SKB Eng. & ConstructionHVAC Pre-Chilled Water Supply & Returned Pipes.Completed 279,835,131 Rahim Yar Khan
18Hamza Power PlantErection of Boiler (150 TPH).Completed 100,000,000 Khan Pur
19Sinoma-ChinaFabrication of Cement Plant Ducting System, Cyclones, Calciners & Structure.Completed 51,600,000 Mepal Leaf Cement Plant Mianwali
20RYK Power HosueFabrication & Erection of P11 Pipe Line.Completed 19,000,000 Rahim Yar Khan
21RYK Power HosueFabrication & Erection of CS & SS Pipe Line.Completed 19,140,000 Rahim Yar Khan
22RYK Power HosueFabrication & Erection of CS Cooling Water Pipe Line.Completed 7,125,000 Rahim Yar Khan
23HMC Ghotki Project1) Erection/Installation of Structure & Auxiliary Equipment.
2) Site Fabrication.,Completed, 13500000 ,Ghotki
24HMC Ghotki ProjectFabrication & Erection of Piping Work.Completed 9,683,825 Ghotki
25HMC Ghotki ProjectErection of Fuel & Ash Handling System.Completed 9,683,825 Ghotki
26Kunnar/KPD PlantATA Erection/Fabrication of Piping.Completed 3,300,000 Hyderabad
27Descon Eng. LtdErection of SS Storage Tank.Completed 490,000 FFCL Sadiq Abad
28Descon Eng. LtdErection of SS Storage Tank.Completed 480,000 FFCL Sadiq Abad
29Descon Eng. LtdErection/Fabrication of CS, SS piping & Pipe Support.Completed 33,450,000 FFCL Sadiq Abad
30Descon Eng. LtdFabrication of SS, CS & Pipe Support & Rolling Pad.Completed 10,400,000 Engro Chemical Dharki
31Descon Eng. LtdFabrication & Erection of Steel structure.Completed 10,500,000 FFCL Sadiq Abad
32Descon Eng. LtdFabrication of SS, CS & Pipe Support.Completed 9,350,000 Engro Chemical Dharki
33Descon Eng. LtdInstallation of GRP Pipe work.Completed 20,774,725 Engro Chemical Dharki
34Descon Eng. LtdErection of Hoppers.Completed 1,430,000 Engro Chemical Dharki
35Descon Eng. LtdFabrication CS, SS, AS, Piping & Pipe Support.Completed 31,350,000 FFCL Sadiq Abad
36Descon Eng. LtdFabrication of Rackway Stoper.Completed 225,000 Engro Chemical Dharki
37Descon Eng. LtdErection of Steel Structure.Completed 3,750,000 Engro Chemical Dharki
38Descon Eng. LtdFabrication CS, SS & AS Clamps.Completed 2,020,633 Engro Chemical Dharki
39Descon Eng. LtdFabrication & Erection of Steel Structure of Ammonia Tank.Completed 8,530,000 Engro Chemical Dharki
40Descon Eng. LtdFabrication & Erection of Steel Structure of Ammonia Tank.Completed 5,970,000 Engro Chemical Dharki
41Descon Eng. LtdFabrication CS, SS & AS Pipes Support & Rolling of Pads for Pipe Support.Completed 6,619,000 Engro Chemical Dharki
42Descon Eng. LtdFabrication of steel structure.Completed 5,625,000 Engro Chemical Dharki
43Descon Eng. LtdFabrication of Hoppers.Completed 5,535,000 Engro Chemical Dharki
44Descon Eng. LtdSteel Structure Shed for HPE Yard Building.Completed 16,667,815 Uch Power Project Dera Murad Jamali
45Descon Eng. LtdFabrication Steel Structure & Sand Blasting Painting.Completed 5,625,000 Engro Chemical Dharki
46Descon Eng. LtdFabrication of SS, CS & AS Pipe Support with Clamps.Completed 4,973,000 Engro Chemical Dharki
47Descon Eng. LtdSupply & Fabrication of Counter Saddles E-504, 506, 508.Completed 687,500 Engro Chemical Dharki
48Descon Eng. LtdPlate Rolling Work for Tank.Completed 1,000,000 Engro Chemical Dharki
49SKB Eng. & ConstructionHVAC pre- insulated Chilled Water Supply & Return pipes.Completed 279,835,131 Shahbaz Air Base
50Descon Eng. LtdPlate Rolling Work for Tanks.Completed 1,000,000 Engro Chemical Dharki
51Descon Eng. LtdFabrication of Cable Tray Support Structure including Sand Blasting with one Coat of Primer.Completed 12,000,000 Engro Chemical Dharki
52Descon Eng. LtdFabrication and Welding Works of all Piping Materials and Thickness.Completed90,000 QR.Qatar
53United Sugar Mills LimitedErection, Installation, and Fabrication.Completed 1,180,000 Rahim Yar Khan
54Bestway Cement LtdFabrication of Misc. Steel Structure for Sack Store Shed Erection.Completed 1,540,000 Chakwal
55CBMC – BCLFabrication & Erection for Day Tank of Bestway Project Fuel Oil System.Completed 1,150,000 Chakwal
56Descon Eng. LtdFabrication of Steel Structure and Equipments.Completed 4,500,000 Pakistan Cement Chakwal
57Descon Eng. LtdFabrication of Steel Structure.Completed 2,250,000 Chakwal Cement

Have a Project in Mind? Get in Touch with Us!

Contact Pak Asia Engineering for a consultation or to get a quote for your next project.